| |
Eradication
of Existing
Pavement
Markings |
| |
We are not
only
effective at
laying down
stripes and
we can also
remove them.
New
construction
involving
traffic
re-alignment
usually
leaves
temporary
and no
longer
required
traffic
markings to
be removed.
Unless
properly
removed,
motorist can
easily be
confused
between the
current
traffic
configuration
and previous
markings.
This
confusion is
most likely
to occur
while
traveling on
wet roadways
or driving
towards the
setting sun.
This can
result in
traffic
accidents
causing
serious
injury, or
even worse,
a fatality. |
| |
|
| |
 |
For all your removal
needs, rely on AKCA!
|
| |
The AKCA
Difference
|
| |
Road line
removal is
like an art,
especially
when dealing
with new and
old
substrates
or concrete.
It is
crucial to
understand
what the
client
requires,
and what
condition do
they want to
leave the
substrate in.
We provide
minimum
impact to
the surface,
gradually
fading back
into the
surrounding
road
surface.
Our method
does not
dish or
gouge the
roadway, and
does not
remove large
amounts of
material,
reducing
surface
maintenance.
|
|
| |
 |
|
|